Pioneer Widening and Discovery Drive Roundabout

Share Pioneer Widening and Discovery Drive Roundabout on Facebook Share Pioneer Widening and Discovery Drive Roundabout on Twitter Share Pioneer Widening and Discovery Drive Roundabout on Linkedin Email Pioneer Widening and Discovery Drive Roundabout link
Aerial image of Pioneer Street from about 56th Pl to just past Royle Rd.

The City's Pioneer Widening and Discovery Drive Roundabout project will widen Pioneer Street, construct a new roundabout at Discovery Drive, and build N Discovery Drive to a new portion of Pioneer Canyon Drive.

When completed, there will be a four-lane roadway along Pioneer Street from just west of Royle Road to I-5, and a new east-west collector roadway (Pioneer Canyon Drive) connecting N Discovery Drive to an extension of 56th Place. This will provide two parallel routes to handle current and future traffic in the area.

Traffic between Interstate 5 and Royle Road is expected to increase as new commercial development planned in the area is constructed and opened. While addressing the necessary improvements for traffic capacity and flow, the City has an opportunity to design the area to be more pedestrian and cyclist friendly.

PROJECT STATUS
(updated May 13)

  • Pioneer Street Traffic Impacts
    • Lane Closures and Shifts begin Monday, May 19: To allow the contractor to complete widening work on Section 4, lane closures and shifts will be in effect on Pioneer Street between Royle Road and Discovery Drive beginning May 19 through mid-August. Lane closures will impact the Royle Road roundabout. No left turns will be permitted onto S 47th Ave from the westbound lane of Pioneer Street.
    • One lane open in either direction on Pioneer Street between 56th Place and Royle Road through September. In September, the contractor will complete final lift paving and Pioneer Street will have two lanes in either direction from 65thAve to just west of Royle Road.
    • Shoulder work, lane shifts and intermittent flagging should be expected on Pioneer Street between Royle Road and 56th Place through September.
    • The new roundabout at Pioneer Street and Discovery Drive is functioning as through lanes for both directions.
  • Discovery Drive/Pioneer Canyon Drive
    • Discovery Drive CLOSED between Pioneer Street and 53rd Place until mid-August to complete Sections 1 and 5.
  • The City is actively coordinating with In-N-Out Burger to ensure all required traffic management measures are in place in advance of their anticipated opening this summer. This effort involves collaboration with Ridgefield Police, Ridgefield Public Works, Clark-Cowlitz Fire Rescue, Washington State Patrol, and the Washington State Department of Transportation. While In-N-Out has not yet shared an opening date, the City is prepared to work closely with the Pioneer Street Widening Project team to help maintain safe and steady traffic flow in the area.
  • Check before you go! Visit our Traffic Page for live cameras at the project area.

Please remember that the speed limit on Pioneer between Royle and 56th is 25 mph, at all times, not just during construction hours.

Thank you for your continued support and patience throughout this project.

View and Sign Up for Traffic Alerts

Section 1:

N Discovery Drive connect to Pioneer Canyon Drive west segment

  • Construction began August 2024.
  • Preliminary lanes Opened to Traffic: October 2024
  • Discovery Drive Closure: approximately June-August 2025
  • Two lanes Open to Traffic: end of August 2025
  • Final Paving September 2025

Preliminary road opened to traffic October 4, 2024.
Closed April 30, 2025 to allow contractor to complete Phase 1including underground utilities, walls, illumination, roadway, curbs, fence and sidewalk.

Section 2:

N 53rd Place and Pioneer Street Intersection, Discovery Drive Roundabout, Widening west to Discovery Drive

  • Construction began September 2024.
  • Pioneer Street Closure: January 13 - April 30, 2025 [COMPLETE]
    Shoulder Work May-September 2025
  • Roundabout and Two Lanes Opened to Traffic: April 30, 2025
  • Final Paving September 2025
  • Four Lanes Open to Traffic: Fall 2025

Expect intermittent flagging, shoulder work and potential lane shifts as work requires to complete "behind the curb" work such as illumination, sidewalk, landscaping.

Section 3:

Pioneer Widening, 53rd to 56th Place

  • Construction began Fall 2024
  • Pioneer Street Closure: January 13 – April 30, 2025 [COMPLETE]
    Shoulder Work May-September 2025.
  • Two Lanes Open to Traffic: April 30, 2025
  • Final Paving September 2025
  • Four Lanes Open to Traffic: Fall 2025

Expect intermittent flagging, shoulder work and potential lane shifts as work requires to complete "behind the curb" work such as illumination, sidewalk, landscaping.

Section 4:

Pioneer Widening Royle Road to Discovery Drive

  • Construction beginning Spring 2025
  • Lane Closure and Shift May 19, 2025 - mid-August 2025: Lane closures and shifts will be in effect on Pioneer Street between Royle Road and Discovery Drive beginning May 19 through mid-August. Lane closures will impact the Royle Road roundabout. No left turns will be permitted onto S 47th Ave from the westbound lane of Pioneer Street.
  • Final Paving September 2025
  • Four Lanes Open to Traffic: Fall 2025

Section 5:

Pioneer Canyon Drive, west leg

  • Construction beginning Summer 2025
  • No traffic impact, building new road.
  • Two lanes Open to Traffic: end of August 2025
  • Final Paving September 2025
  • Completed: Fall 2025

This western leg of Pioneer Canyon Drive will connect the future Ridgefield Community and Recreation Center to Pioneer Street.


City Project

Pioneer StreetThis project will widen Pioneer Street to a four-lane section from Rosauers to the 56th Place roundabout.

The new segment of Pioneer will include two travel lanes and a shared use path, separated from vehicles by a planter strip, in either direction.

RoundaboutA new roundabout will be constructed at Discovery Drive.
Discovery DriveN Discovery Drive will be built to connect to a new east-west parallel route, Pioneer Canyon Drive, being built by the developer of Union Ridge Town Center/Costco. This segment of Pioneer Canyon Drive will connect Discovery Drive to N 56th Place, which was built by the Union Ridge Town Center and Costco developer.
Pioneer Canyon DriveThe City project will include a short western leg of Pioneer Canyon Drive at Discovery Drive, to provide access to the new Ridgefield YMCA.


Developer Projects

The construction of N 56th Place, N 53rd Place and the eastern leg of Pioneer Canyon Drive was completed by the developer of Union Ridge Town Center. The developer's project included the construction of a new roundabout at N 56th Place and Pioneer Canyon Drive.

The developer of Ridgefield Gateway will be adding a turn lane and other improvements to the north side (westbound direction) of Pioneer Street between I-5 and 56th Place.

The developer will also construct modifications to the Pioneer Street and Interstate 5 interchange that will create additional lane capacity.


Project Strip Map

Coordination

The City's Pioneer Widening and Discovery Drive Roundabout project is just one piece of a group of transportation infrastructure improvements planned for the area. Several projects will be completed by private developers, paying for the increased infrastructure needs their projects will create.

The map below shows all of the projects, color coded by whether the project will be done by the City, or by a Developer. This is a conceptual map and does not show exact road alignments.



ProjectYears of Construction
1Widen Pioneer Street from 56th Place to Royle Road. Construct new roundabout at Discovery Drive2024-2025
2Build the South 10/11th Street Corridor and I-5 Overpass2028
3Widen Royle Road to minor arterial (3 lanes)2024/2025
4Build Pioneer Canyon Drive as industrial/commercial collector2024
5Build N Discovery Drive as industrial/commercial collector2024/2025
6Build N 56th Place as industrial/commercial collector2024
7Build S Discovery Drive as minor arterial2024
8Build new east-west collector south of Pioneer2024/2025
9Build new north-south connector east of I-52024/2025
10Build new regional stormwater facility at I-5 Junction2024


The City's Pioneer Widening and Discovery Drive Roundabout project will widen Pioneer Street, construct a new roundabout at Discovery Drive, and build N Discovery Drive to a new portion of Pioneer Canyon Drive.

When completed, there will be a four-lane roadway along Pioneer Street from just west of Royle Road to I-5, and a new east-west collector roadway (Pioneer Canyon Drive) connecting N Discovery Drive to an extension of 56th Place. This will provide two parallel routes to handle current and future traffic in the area.

Traffic between Interstate 5 and Royle Road is expected to increase as new commercial development planned in the area is constructed and opened. While addressing the necessary improvements for traffic capacity and flow, the City has an opportunity to design the area to be more pedestrian and cyclist friendly.

PROJECT STATUS
(updated May 13)

  • Pioneer Street Traffic Impacts
    • Lane Closures and Shifts begin Monday, May 19: To allow the contractor to complete widening work on Section 4, lane closures and shifts will be in effect on Pioneer Street between Royle Road and Discovery Drive beginning May 19 through mid-August. Lane closures will impact the Royle Road roundabout. No left turns will be permitted onto S 47th Ave from the westbound lane of Pioneer Street.
    • One lane open in either direction on Pioneer Street between 56th Place and Royle Road through September. In September, the contractor will complete final lift paving and Pioneer Street will have two lanes in either direction from 65thAve to just west of Royle Road.
    • Shoulder work, lane shifts and intermittent flagging should be expected on Pioneer Street between Royle Road and 56th Place through September.
    • The new roundabout at Pioneer Street and Discovery Drive is functioning as through lanes for both directions.
  • Discovery Drive/Pioneer Canyon Drive
    • Discovery Drive CLOSED between Pioneer Street and 53rd Place until mid-August to complete Sections 1 and 5.
  • The City is actively coordinating with In-N-Out Burger to ensure all required traffic management measures are in place in advance of their anticipated opening this summer. This effort involves collaboration with Ridgefield Police, Ridgefield Public Works, Clark-Cowlitz Fire Rescue, Washington State Patrol, and the Washington State Department of Transportation. While In-N-Out has not yet shared an opening date, the City is prepared to work closely with the Pioneer Street Widening Project team to help maintain safe and steady traffic flow in the area.
  • Check before you go! Visit our Traffic Page for live cameras at the project area.

Please remember that the speed limit on Pioneer between Royle and 56th is 25 mph, at all times, not just during construction hours.

Thank you for your continued support and patience throughout this project.

View and Sign Up for Traffic Alerts

Section 1:

N Discovery Drive connect to Pioneer Canyon Drive west segment

  • Construction began August 2024.
  • Preliminary lanes Opened to Traffic: October 2024
  • Discovery Drive Closure: approximately June-August 2025
  • Two lanes Open to Traffic: end of August 2025
  • Final Paving September 2025

Preliminary road opened to traffic October 4, 2024.
Closed April 30, 2025 to allow contractor to complete Phase 1including underground utilities, walls, illumination, roadway, curbs, fence and sidewalk.

Section 2:

N 53rd Place and Pioneer Street Intersection, Discovery Drive Roundabout, Widening west to Discovery Drive

  • Construction began September 2024.
  • Pioneer Street Closure: January 13 - April 30, 2025 [COMPLETE]
    Shoulder Work May-September 2025
  • Roundabout and Two Lanes Opened to Traffic: April 30, 2025
  • Final Paving September 2025
  • Four Lanes Open to Traffic: Fall 2025

Expect intermittent flagging, shoulder work and potential lane shifts as work requires to complete "behind the curb" work such as illumination, sidewalk, landscaping.

Section 3:

Pioneer Widening, 53rd to 56th Place

  • Construction began Fall 2024
  • Pioneer Street Closure: January 13 – April 30, 2025 [COMPLETE]
    Shoulder Work May-September 2025.
  • Two Lanes Open to Traffic: April 30, 2025
  • Final Paving September 2025
  • Four Lanes Open to Traffic: Fall 2025

Expect intermittent flagging, shoulder work and potential lane shifts as work requires to complete "behind the curb" work such as illumination, sidewalk, landscaping.

Section 4:

Pioneer Widening Royle Road to Discovery Drive

  • Construction beginning Spring 2025
  • Lane Closure and Shift May 19, 2025 - mid-August 2025: Lane closures and shifts will be in effect on Pioneer Street between Royle Road and Discovery Drive beginning May 19 through mid-August. Lane closures will impact the Royle Road roundabout. No left turns will be permitted onto S 47th Ave from the westbound lane of Pioneer Street.
  • Final Paving September 2025
  • Four Lanes Open to Traffic: Fall 2025

Section 5:

Pioneer Canyon Drive, west leg

  • Construction beginning Summer 2025
  • No traffic impact, building new road.
  • Two lanes Open to Traffic: end of August 2025
  • Final Paving September 2025
  • Completed: Fall 2025

This western leg of Pioneer Canyon Drive will connect the future Ridgefield Community and Recreation Center to Pioneer Street.


City Project

Pioneer StreetThis project will widen Pioneer Street to a four-lane section from Rosauers to the 56th Place roundabout.

The new segment of Pioneer will include two travel lanes and a shared use path, separated from vehicles by a planter strip, in either direction.

RoundaboutA new roundabout will be constructed at Discovery Drive.
Discovery DriveN Discovery Drive will be built to connect to a new east-west parallel route, Pioneer Canyon Drive, being built by the developer of Union Ridge Town Center/Costco. This segment of Pioneer Canyon Drive will connect Discovery Drive to N 56th Place, which was built by the Union Ridge Town Center and Costco developer.
Pioneer Canyon DriveThe City project will include a short western leg of Pioneer Canyon Drive at Discovery Drive, to provide access to the new Ridgefield YMCA.


Developer Projects

The construction of N 56th Place, N 53rd Place and the eastern leg of Pioneer Canyon Drive was completed by the developer of Union Ridge Town Center. The developer's project included the construction of a new roundabout at N 56th Place and Pioneer Canyon Drive.

The developer of Ridgefield Gateway will be adding a turn lane and other improvements to the north side (westbound direction) of Pioneer Street between I-5 and 56th Place.

The developer will also construct modifications to the Pioneer Street and Interstate 5 interchange that will create additional lane capacity.


Project Strip Map

Coordination

The City's Pioneer Widening and Discovery Drive Roundabout project is just one piece of a group of transportation infrastructure improvements planned for the area. Several projects will be completed by private developers, paying for the increased infrastructure needs their projects will create.

The map below shows all of the projects, color coded by whether the project will be done by the City, or by a Developer. This is a conceptual map and does not show exact road alignments.



ProjectYears of Construction
1Widen Pioneer Street from 56th Place to Royle Road. Construct new roundabout at Discovery Drive2024-2025
2Build the South 10/11th Street Corridor and I-5 Overpass2028
3Widen Royle Road to minor arterial (3 lanes)2024/2025
4Build Pioneer Canyon Drive as industrial/commercial collector2024
5Build N Discovery Drive as industrial/commercial collector2024/2025
6Build N 56th Place as industrial/commercial collector2024
7Build S Discovery Drive as minor arterial2024
8Build new east-west collector south of Pioneer2024/2025
9Build new north-south connector east of I-52024/2025
10Build new regional stormwater facility at I-5 Junction2024


Submit a Comment or Question

Submit a Comment of Question to the project team. 